News

 
R Collard's chose ACP to supply the prestressed concrete wall panels required for their new MRF at Eversley, Hampshire.
CE Logo
In accordance with the Construction Products Regulations (CPR),which came into force on 1st July 2013, all ACP Concrete products are CE Marked.
ACP (Concrete) Ltd manufactured and installed dock leveller pits, retaining walls and dado blockwork replacement panels to a new storage facility for Newly Weds Foods at Ossett.
Following the successful supply and installation of concrete products to a previous Biogen (UK) Ltd AD facility at Harper Adams University, ACP were approached by Adonis Construction to do the same again. This time the site was at Llywn Isaf, Clynogg Fawr, near Caernarfon in North Wales. The first of its kind for Wales all parties stuck with a familiar supply chain. Adonis are the main contractor on site working for Biogen. ACP supplied & installed the push walls to the main reception building and 128 No. vertical cantilever panels to form a 3m high bund wall to the site.
 
 
 

Enquiries

Floors / Stairs:

01900 814659

Walls, Agriculture and Bespoke:

01889 598660
 
 
Back to the top of the page