New Silage Clamp at Cambridge University Farm

Prestressed concrete panels have recently been supplied and installed in a silage clamp at Park Farm, Madingley for RG Carter Ltd as part of a major upgrade to the farm facilities. The clamp is 35m deep x 22m wide and has a single division wall, the vertical 180mm thick panels were installed in 8 days and the installers will be returning in December to fit panels to the calf and lambing building.

 
 
Enquiries
Find us
 
 
Back to the top of the page